Project

S35 Brucker Schnellstraße: Portal © S35 Brucker Schnellstraße:  © Helmut TezakS35 Brucker Schnellstraße:  © Helmut TezakS35 Brucker Schnellstraße:  © Helmut Tezak

S35 Brucker Schnellstraße

Architecture support plan
Austria
2002–2010

Details

The architectural support plan for the section of the motorway S35 was the winner scheme of an invited competition. The concept of the design aims to offer the driver a feeling of gliding thought the street, where several design elements are integrated in this section, reinforcing the connection between the user and its environment. The reference to the landscape is always present and the project intends to highlight is as much as possible.
The portals of the tunnel are important moments in the project. These are marked by a canopy-like structure made of steel, that stands out from the landscape and simultaneous, the green steep slopes that cover it, integrating the tunnels in its surroundings. In the section next to the natural park of Mixnitz, transparent noise barriers were placed, so that the users can enjoy and connect with the outstanding landscape.

Construction phase North - Stausee Zlatten - Mautstatt : 6,315m
Construction phase South - Mautstatt - Rothelstein : 4,525 m

Scope of work: around 11 km of new highway , five tunnel portals , four operating stations , a green bridge , 5,887 linear meters of noise barriers , anchor walls , retaining wall panels , vegetation.

Share On Facebook

    Status

  • Completed

    Type

  • Infrastructural & Public Space

    Competition

  • Invited Competition, 1st Place

    Client

  • ASFINAG Bau Management GmbH

    Team

  • Alfred Bramberger
  • Rupert Richter-Trummer
  • Maria Richter-Trummer
  • Ing. Hans Waldhör

    Anchor Wall Planning

  • Dorr-Schober & Partner Ziviltechniker GmbH

    Competition

  • 2002-05

    Environmental Planning

  • Hugo Kofler
  • Maria Wiener

    Road Engineering

  • Poltnigg & Klammer
  • Rinderer & Partner ZT KEG

    Statics

  • Gerhard Meier (Tunnelportal)

    Commencement

  • 2003-09

    Completion

  • 2010-05

    Cost

  • 2.500.000 EUR

    Awards

  • Bauherrenpreis 06

    Images

  • Portal (Nr. 1)
  • © Helmut Tezak (Nr. 2)
  • © Helmut Tezak (Nr. 3)
  • © Helmut Tezak (Nr. 4)